Drainage measures shall be provided for the villa room and overhead layer of the road surface of the cold storage engineering building.

Installation of box and operating device: the design of box shall be reasonable, electrical switches, etc. shall be reliable, safe, long-term cold storage installation, cold storage installation, cold storage construction fruit preservation cold storage, medical cold storage, price advantage and quality guarantee! Easy to identify and operate. The indicator light shall be simple and clear. The device and each switch shall be installed on the upper side outside the warehouse door, which is easy to operate, read data and not easy to be damaged, and shall be reliably fixed. The device box is installed on the door frame plate on the door opening side. The center line of the box overlaps the center line of the door frame plate. The bottom of the box is 1800mm above the ground and is reliably fixed. The lighting lamp and door frame wire switch in the warehouse are installed directly below the device, and the height of the bottom edge of the switch box is about 1400mm.

Semporna.When the actual scheme is determined, sometimes two defrosting schemes are adopted, and sometimes different schemes are combined. For example, the shelving, wall and top smooth pipes of the controlled atmosphere storage can be manually combined with the hot gas method. The frost can be manually swept at ordinary times, and the hot gas defrosting can be carried out regularly, so as to thoroughly understand the frost that is not easy to be removed by manual sweeping and the oil accumulation in the pipeline. Cold fan water flushing and hot gas method. Hot air combined with water can be used for defrosting if there is a lot of frost and the controlled atmosphere storage needs to be defrosted frequently.

During the production of cold storage, the cold storage will produce fixed length, width and thickness according to the needs of various cold storage projects. Generally, 10cm thick cold storage plates are selected for high and medium temperature cold storage. The requirements for cold storage engineering plates of low-temperature storage and quick-frozen storage will be higher. Professional cold storage installation, installation, construction, fruit fresh-keeping cold storage and medical cold storage ensure the quality, Guarantee service. Guarantee quality. Your satisfaction is our pursuit! Welcome to inquire. In this case, use 12cm or 15cm thick library board. When you budget the cold storage project, you can make a reservation according to the specific conditions of your cold storage temperature. If you don't make a reservation for the cold storage plate, you should pay attention to the density of the cold storage plate and the thickness of the steel plate when purchasing the cold storage plate. According to the regulations, the cold storage shall be distributed

.Cork board: cork board can be said to be a relatively primitive kind of cold storage. The thermal conductivity of cork board is relatively low,SempornaFresh food cold storage, and it is easy to obtain, so it is not difficult to process, so it is generally used as the insulation board in some ordinary cold storage. If you want to pursue better thermal insulation performance, you have to look at the following materials.

In the process of realizing your dream, you must remove all the influences. It is very important to recognize that when these beautiful refrigerators are built in the villa room, the collection pit (pool) for flushing (thawing) and drainage should adopt the Countermeasures of avoiding freezing and cleaning and avoiding backflow of water.

Danfoss thermal valve is adopted for the thermal valve of the cold storage, with guaranteed quality; Due to the high temperature requirements of the cold storage and the high degree of automation and regulation of the temperature, the temperature system of the cold storage adopts microcomputer full-automatic, does not need special people to operate, and can be remotely controlled. When the temperature exceeds the specified range,SempornaWell known cold storage installation, it will automatically alarm, which is of great significance to the proper preservation of the cold storage.


SempornaHow much is the fruit cold storageWhat precautions



Precautions for purchase and shipment when using the medical cold storage project, the speed must be strictly guaranteed during the purchase and shipment of products. If the temperature of the medical cold storage is about degrees, the opening time must be strictly within 25 minutes. If the temperature of the medical cold storage is left and right degrees, the opening time can not be too high, strictly within minutes.

Due to the slow cooling, all equipment will consume electric energy during operation. If the cooling is slow, the equipment will stop and cannot consume electricity, so the electricity charge will not be consumed. As a high energy consuming equipment, the daily power consumption of cold storage is relatively large. If the refrigeration effect is not good, the annual use cost will directly double several times. Moreover, if the equipment operates for a long time, the service life will be reduced accordingly, which is something users don't want to see.

Preparation, prepare the project planning of cold storage, and prepare the construction site and construction materials. All kinds of materials for cold storage construction are customized according to the needs of customers. Sort out the construction site that meets the requirements, transport all installation materials to the construction site, check the material quality and model, and start the installation of cold storage after confirmation.

Focus on Development.Panel types of quick freezing warehouse: color plastic steel plate,SempornaProfessional cold storage installation, salted steel plate, stainless steel plate, embossed aluminum, the butt joint shall be filled with foaming material, and the 80mm wide color steel plate shall be sealed at the butt joint with pull riveting.

Floor insulation of medium-sized cold storage the structure of medium-sized cold storage is what we often call the surface, while the ground needs to be insulated separately. At present the top and wall are made of color steel plate / stainless steel with appropriate thickness of polyurethane and other insulation materials, the common operations in the market are: laying the ground with XPS extruded board, laying moisture-proof and steam isolating SPS materials above and below the extruded board respectively, and then pouring concrete or reinforced concrete.


SempornaHow much is the fruit cold storageWhat precautions



Feasibility of the design scheme: the design of the quick-frozen warehouse can not be taken for granted. Many restrictive factors should be considered. In practice, a reasonable design scheme should be given according to local conditions. For example, the large-scale quick-frozen warehouse I built for my family should be refrigerated with ammonia in theory, because the refrigeration capacity of ammonia refrigeration is large, and I found that it is cheap to replicate cold through actual field investigation.

The cheapest.These measures have achieved quite good results. Compared with several cold storages at a customer in Jining, the cold storages using their white materials have significantly lower power consumption than those using other white materials.

It takes 24 hours after the installation of the controlled atmosphere warehouse to deposit the goods, so as to quickly meet the temperature required by the goods and ensure that the controlled atmosphere warehouse equipment can operate normally.

When opening and drilling is required for the top warehouse plate or wall plate, the internal and external setting out and positioning shall be carried out according to the drawing design requirements, and the opening and drilling shall be carried out after review; The inlet hole, liquid inlet hole, return hole water supply hole and drainage hole shall be opened with a hole opener. Construction treatment shall be carried out in time after opening and drilling, and the orifice shall be closed with foaming material or sealant to prevent air leakage and cold running; The door, vent and delivery port shall be decorated with wrapped edges and fixed with pull rivets with a spacing of 300mm and 150mm outside.

Semporna.Installation of box and operating device: the design of box shall be reasonable, and the appearance quality shall meet the requirements of beauty and practicality. All buttons, electrical switches, etc. shall be reliable, safe, long-term cold storage installation, cold storage installation, cold storage construction, fruit preservation cold storage, medical cold storage, 20-year-old brand, price advantage and quality guarantee! Easy to identify and operate. The indicator light shall be simple and clear. The device and each switch shall be installed on the upper side outside the warehouse door, which is easy to operate read data and not easy to be damaged, the turbidity of cooling water shall be frequently, the cooling water shall be replaced frequently, and whether the running, emitting, dripping, leakage and other conditions of the water supply system exist.

First, use a hammer to pad the wood on the polyurethane warehouse board between the two warehouse boards, so as to make the boards closely close to each other. Two sets of connecting pieces shall be wedged between the wall panel and the wall panel, and the two sets of connecting pieces shall be fixed on the upper, outer and lower sides of the gap between the wall panel and the wall panel respectively. The lower connecting piece shall be as close as possible to the lower side, so that the post cast concrete can cover the connecting piece. After the gap between the plate and the plate ground is wedged with a connector, remove the plate, trim the plate edge, and then reinstall it to make the plate joint meet the requirements. When fixing the adapter pay attention to fix the two parts of the adapter on the edges of the convex and concave library plates respectively, and fix them with rivets. The spacing of the adapter should be able to tension the two library plates. When wedging the wedge iron, the hammer shall be perpendicular to the wedge iron to prevent damaging the warehouse plate. The ground wedge iron at the upper and lower parts shall be wedged at the same time, and the wedge iron shall be fixed with rivets.