CharlottetownHow much is it to install a cold storageOperating procedures

announcer:hp632HP195506591 release time:2022-03-12 12:31:30

Generally speaking, the construction of cold storage is to ensure the quality of buildings with its strict heat insulation, sealing, cold storage installation, cold storage construction, fruit fresh-keeping cold storage, medical cold storage, strict testing, quality assurance. Preferential activities are in progress. Welcome to consult. It has a good heat insulation effect. Then, the water vapor in the cold storage is easy to condense and the water absorption of extensional perlite is particularly strong. If it absorbs a lot of water, its nature will be greatly reduced. Therefore, it is necessary to be careful to select extensional perlite as cold storage.

Charlottetown.Compared with the logistics engineering design of ordinary commodities, the logistics refrigeration engineering commonly used in the circulation of fresh food should follow more stringent design specifications and use requirements, with the frequent cross regional trade, KFC refrigeration has received more and more demand in the design and construction of logistics refrigeration engineering. What are the basic functions of logistics refrigeration engineering in design?

Where do you need to build the refrigerator, the size of the refrigerator or the storage capacity (size, storage capacity, ton, cubic meter, frame, box); What products are stored in the built cold storage? The actual storage temperature, storage time and setting temperature can be indicated by specific regulations; If your cold storage becomes larger, you need to master your individual storage volume, the temperature of goods in and out of the warehouse, the frequency of opening and closing the door, etc. If this is clear, such as refrigeration compressors, refrigeration units, industrial cooling fans / pipe slots, thermal insulation materials, coolers, doors, temperatures and other refrigeration equipment.

.There are two reasons: the refrigerant charge is insufficient. At this time, just add enough refrigerant.

Install the temporary lighting facilities in the warehouse, install and arrange the construction electrical equipment and do a good job in rain proof,CharlottetownFruit fresh-keeping cold storage installation project, moisture-proof, anti-collision anti binding and other safety protection.

Wall and floor fixtures shall start at corners. According to the plate layout drawing, transport the two plates at the corner of the required device to the device location. According to the plate beam height and the model of the angle iron for fixing the mushroom head nylon bolt, drill a hole at the corresponding elevation in the middle of the plate width. When drilling, the electric drill should be perpendicular to the plate surface. Put the mushroom head nylon bolt in the hole, tighten the angle iron, and tighten it horizontally, so as to make the nylon bolt on the surface of the warehouse plate slightly concave. When setting up the wall panels, foam data and other soft data should be laid on the floor slots along with the floor of the storehouse, so as to avoid damaging the storehouse. After the two corner panels are neutrally removed from the floor, the plane position of the wallboard and the verticality of the storehouse should be adjusted in time according to the location of the laying line, and check whether the top elevation of the wallboard can be correct. After the position of the wallboard is correct, weld the angle iron on the plate beam and fix the inner and outer corners. When welding the angle iron parts,CharlottetownFruit preservation freezer, the angle iron parts of the warehouse plate shall be covered with a shield to avoid the high temperature of the welding ground baking the warehouse plate and welding slag on the warehouse plate during electric arc welding.


CharlottetownHow much is it to install a cold storageOperating procedures



Various construction materials, such as material certificate, test report and stage acceptance record shall be carried out simultaneously with the project construction,CharlottetownProfessional installation of cold storage, carefully, timely, accurately and comprehensively reflect the whole process of production and construction, and actively cooperate with the owner in design change and technical negotiation.

For the selection and preparation of the ground location of the cold storage, the design of the cold storage shall consider the necessary auxiliary engineering buildings and equipment, packaging and combing room, special tool warehouse, loading and unloading platform etc.

When installing the polyurethane insulation board, the adhesion between the panel of the polyurethane insulation board and the thermal insulation material is short and often high.

Focus on Development.The evaporator surface is too thick or too much dust, and the heat transfer effect decreases: another important reason is that the heat transfer efficiency of evaporator is low, which is mainly caused by excessive frost or excessive dust on the evaporator surface.

The medical cold storage has been widely used in the industry. For the use of the medical cold storage project, we must combine the performance of the product and store it according to the temperature and humidity required by the product. The automatic temperature box also needs to be used outside the product cold storage. At the same time, plus the row to row corridors, the indoor space between the pile and the wall, the ceiling and the gap of the packaging house. After the volume of the cold storage is determined, the length and height width ratio of the cold storage shall be determined. Necessary auxiliary engineering buildings and equipment shall also be considered in the design of cold storage, such as working intermediate, packaging and combing room, special tool warehouse, loading and unloading platform, etc.


CharlottetownHow much is it to install a cold storageOperating procedures



These are several very common cold storage materials. The use of these materials has greatly improved the thermal insulation and refrigeration performance of the cold storage, which makes people's retained items more convenient and reliable. With the continuous development of material technology, and the cold storage is different from each other. When purchasing, we should make reasonable comparison and select products suitable for our own use needs and economic conditions.

For more, please check.The new cold storage material is made of rigid polyurethane or polystyrene foam insulation sandwich panel, which is made by high pressure foaming process and can be made into various lengths and specifications to meet the different requirements of the users.

The water-cooled cold storage shall keep the cooling water tower clean and keep the air around the water tower circulating with low temperature, so as to avoid sundries from entering the cooling tower and reduce the heat dissipation efficiency.

The closed cell structure and surface material of polyurethane rigid foam with good moisture-proof, waterproof and corrosion resistance make it have better air resistance and water vapor resistance, and it can be made into inlaid connection structure during forming, which is easy to assemble. It does not need additional insulating layer to prevent moisture and saves a lot of trouble in laying insulating layer.

Charlottetown.The construction of small cold storage is widely used in life, such as food industry, manufacturing industry, etc. since cold storage is so widely used, do you know cold storage? Especially the construction process and steps of cold storage. Understanding the construction process and steps of cold storage is helpful for all links of cold storage maintenance.

During the early operation of the refrigeration unit, carefully observe the oil return of the compressor and keep it clean. If it is found that the oil level is not clean enough or the oil level drops, replace it with new oil in time, so as to avoid bad compressor and reduce the service life of the compressor.

It is equipped with temperature compensation to automatically adjust the water temperature. The water temperature of ultrasonic atomization is 15-20 degrees. If our humidifier is connected with the warehouse, there is no temperature compensation, even if